

Three days after the demo the deck was complete. New codes for Chicago means our deck is over-engineered and rock solid. Heather observed our garbage collectors peering over our fence staring at the new deck. We think they liked it. We do.
what will be the dining room- first floor. the first room you would enter from the front door.
first floor- the library and guest room
first floor bath. not exactly our style but the lesser of the two evils for the moment
the teenage boy's room will become our office/clean studio room.
the kitchen. its on the first floor. it looks like its being torn out but we're refinishing the cabinets, replacing the backsplash tiles, getting a new countertop and hopefully a new floor...as opposed to the one really being torn out on the second floor.
the first floor room of the soon-to-be-no-more enclosed porch.
stairs to second floor. found perfect oak treads under the linoleum!
living room, second floor. the stairs are behind that door all the way to the left. then just to the right of that is the little bedroom.

former kitchen, second floor. the reason we couldn't close on 09/04.
second floor bathroom
i know- yikes. second floor of the enclosed porch science experiment.
half of the basement space that's had the drywall removed. eventually it will be a huge studio workshop area.
looking through a former wall and into the other half of the studio.
bags of moldy drywall and insulation.